Textile fabrics
You need to understand the testing of non-manufactured fabrics using melt blown method
You need to understand the testing of non-manufactured fabrics using melt blown method
Click here for online message:
Drop us a line
Service@Baijiantest.Com
You need to understand the testing of non-manufactured fabrics using melt blown method

How to process textile material testing reports? What are the testing items and standards? Baijian Testing can provide you with materials and other related testing services

Testing cycle: 3-15 working days (expedited)

Report qualifications: CNAS, CMA, CAL, etc.

Testing costs: quoted based on customer needs and experimental complexity

Testing items:

Partial parameters, longitudinal and transverse fracture elongation, selection of technical requirements, marking, packaging, transportation and storage, fracture elongation, thickness, filtration efficiency, air permeability, flame retardant performance, color difference, width deviation, appearance quality, unit area quality variation coefficient, unit area quality deviation rate, fracture strength, restricted (prohibited) substances, packaging

Testing standards:

1. GB/T 11048-2018 Technical Requirements for Selection

2. GB 250-2008 Appearance Quality

3. FZ/T 64078-2019 Melt Blown Non woven Fabric FZ/T 64078-2019

4. GB/T 11048-2018 Textiles - Determination of Thermal and Wet Resistance under Steady State Conditions of Physiological Comfort GB/T 11048-2018

5. GB/T 24218.3-2011 Textiles - Non woven Fabric Test Methods Part 3: Determination of Breaking Strength and Breaking Elongation (Strip Method) GB/T 24218.3-2010

6. Technical requirements for optional items in GB/T 32610-2016

7 GB/T 32610-2016 Technical Specification for Daily Protective Masks GB/T 32610-2016

8, FZ/T 64078-2019 Melt blown Non manufactured Clothes

9, GB/T 24218.15-2018 Technical Requirements for Optional Items

10, GB/T 24218.15-2018 Textiles Non woven Clothes Test Methods Part 15: Determination of Air Permeability GB/T 24218.15-2018

100% Inspection Process:

1. Telephone communication and confirmation of requirements 2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is required