Textile fabrics
You need to know about clothing/washing and finishing, clothing inspection, and so on
You need to know about clothing/washing and finishing, clothing inspection, and so on
Click here for online message:
Drop us a line
Service@Baijiantest.Com
You need to know about clothing/washing and finishing, clothing inspection, and so on

How to process textile material testing reports? What are the testing items and standards? Baijian Testing can provide you with materials and other related testing services

Display style: electronic version

Testing cycle: 3-15 working days (can be expedited)

Report qualifications: CNAS, CMA, CAL, etc.

Testing items:

Breaking strength, appearance quality, splicing, appearance defects, dye migration performance, raw materials, sewing, ironing appearance, strip to grid, allowable deviation in specifications, warp and weft yarn direction, smoothness of seam appearance after washing and drying, color fastness of splicing and dyeing, smoothness of appearance after washing and drying, degree of seam slippage.

, Partial parameters

Testing standards:

1. GB/T22700-2008 4.9 Washed and Organized Clothing

2. FZ/T 22700-2008 Washed and Organized Clothing/

3. GB/T22700-2008 4.8 Washed and Organized Clothing

4. GB/T 22700-2016 Washed and Organized Clothing/

5. GB/T22700-2008 4.7 Washed and Organized Clothing

6. GB/T22700-2008 4.6 Washed and Organized Clothing

7. GB/T22700-2008 4.11.1 Washed and Organized Clothing

>8 GB/T 22700-2016 Water Washed and Finished Clothing/

9, GB/T 22700-2008 4.5 Water Washed and Finished Clothing

10, GB/T 22700-2008 4.4 Water Washed and Finished Clothing

11, GB/T 22700-2008 B Water Washed and Finished Clothing

12, GB/T 22700-2008 Water Washed and Finished Clothing/

13, GB/T 22700-2008 4.3 Water Washed and Finished Clothing

14, GB/T 22700-165.2-5.3 Water Washed and Finished Clothing

15, GB/T 21294-2014 Inspection Methods for Physical and Chemical Properties of Clothing

16 GB/T22700-2008 4.10 Water Washed and Finished Clothing

Inspection Process Steps

1. Telephone communication and confirmation of requirements 2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is required