Electronics
Electrical wiring, wire and cable inspectionProject & Standard Analysis
Electrical wiring, wire and cable inspectionProject & Standard Analysis
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Electrical wiring, wire and cable inspectionProject & Standard Analysis

How to do the test report? Why do you need to do product inspection? Third-party testing institutions provide product testing services in various industries, and there are many cooperative laboratories across the country, mainly serving companies, enterprises, individual businesses, universities and scientific research.

Report qualification: CNAS, CMA, CAL, etc.

Testing costs: according to customer needs and experimental complexity, quotation

sample size: according to the sample

size to choose the sample or door-to-door

display style: electronic version

Testing cycle: 3-15 working days (expedited).

Scope

1.1 This standard applies to electrical wiring cables (AWM), which can be single core wires, multi-core cables, optical fibers, or insulated cores and optical fiber components used as multi-core cable components

1.2 Electrical wiring cables (AWM) applicable to this standard are only used for factory installation wiring. They can be wiring inside electrical or other equipment enclosures (internal wiring), interconnections between electrical appliances (external wiring), or as components of multi-core cables for further processing

1.3 This standard does not apply to any wires, cables, or flexible cords currently included in the National Electrical Code (NEC) NFPA70 of the United States, if they are not intended to be laid in buildings or structures in accordance with NEC regulations outside the scope of the installation instructions for the intended final product 1.4 Electrical wiring cables (AWM) applicable to this standard, with a minimum operating temperature of 60 ℃ (140 ° F) in a dry environment and a minimum rated voltage of 30V. The conductor specifications range from 50AWG to 2000kcmil. Electrical wiring cables composed entirely of fiber optic components or electrical wiring cables composed of wires and fiber optic components are also applicable to this standard This standard does not involve the optical performance of any fiber optic components or fiber optic component groups In addition to the wires and cables with the above structures, this standard also establishes guidelines for evaluating wires and cables with special structures. These wires and cables do not need to meet all the requirements of general electrical wiring cables due to the nature of the intended final product The final acceptance of electrical wiring cables (AWM) depends on their use in complete equipment that meets applicable standards If a product containing new performance, characteristics, components, materials, or systems that differ from the requirements of this standard poses a risk of fire, electric shock, or personal injury, it should be evaluated according to the additional requirements of the corresponding component or finished product; This is necessary to ensure that the product meets the allowable safety level expected by the standard. Products whose performance, characteristics, components, materials, or systems may conflict with the specific requirements of this standard cannot be identified as meeting the standard. If deemed appropriate, recommendations and modifications to the standard can be made in accordance with the principles, modifications, and implementation methods of this standard

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

100% inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

Testing process

1, sending samples

2, checking requirements

3, targeted quotation

4, both parties determine, sign a contract, start

the experiment

5, complete the experiment: the testing cycle (can be expedited) will be changed according to the sample and its testing items / methods, you can consult the engineer

6, issue a test report, and provide post-service.