Electronics
Electromagnetic furnace detectionList and introduce project standards
Electromagnetic furnace detectionList and introduce project standards
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Electromagnetic furnace detectionList and introduce project standards

List of relevant testing items of 100 inspectionsThird-party testing institutions support sample sending and door-to-door testing, mainly providing sample testing services for companies, enterprises, public institutions, individual businesses, and university scientific research, and reporting CMA/CNAS/CAL qualifications, which are true and effective.

Display style: electronic

version of the testing cycle: 3-15 working days (expedited available)

Report qualification: CNAS, CMA, CAL, etc

How to handle the electromagnetic furnace inspection report? The induction cooker is a product of the modern kitchen revolution, which generates heat directly at the bottom of the pot without the need for open flames or conductive heating, thus greatly improving thermal efficiency. It is an efficient and energy-saving kitchenware, completely different from all traditional heated or non heated conductive kitchenware. The electromagnetic furnace needs to provide a testing report when entering the e-commerce platform

Testing standards for induction cookers:

GB 4706.1-2005 "Safety of household and similar electrical appliances - Part 1: General requirements"

GB 4706.30-2008 "Safety of household and similar electrical appliances - Part 2: Special requirements for kitchen machinery"

Electromagnetic furnace testing items:

1. Protection against touching live parts

2. Input power and current

3. Hidden and mechanical hazards

4 structures

5. Internal wiring

6. Grounding measures

7. Heat resistance and flame resistance

How to handle the electromagnetic furnace testing report

1. Submit the electromagnetic furnace testing application to our third-party inspection agency

Please form 2. Negotiate the cost, items, and cycle of electromagnetic furnace testing 3. Send samples for electromagnetic furnace testing, and send the electromagnetic furnace by express delivery to our inspection agency laboratory

4. Issue an electronic report for your review, and after reviewing it without any errors, issue the report.

5. Send the paper report to you

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

100% inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

100 inspection and testing process:

1. Telephone communication and confirmation of needs;

2. Recommend the plan and confirm the quotation;

3. Mailing samples and arranging testing;

4. Progress tracking and result feedback;

5. Issue reports and after-sales service;

6. If it needs to be expedited, priority processing;