
This section applies to the electrical types specified in 1.1 and 1.2, with the main contact used to connect circuits with a rated voltage of AC not exceeding 1000 V or DC not exceeding 1500 V. The starters and/or contactors involved in this section are generally not used to break short-circuit currents. So appropriate short-circuit protection appliances (see 9.3.4) form a part of the equipment, but are not necessary for contactors or starters. This section applies to the following contactors and starters: - - Contactors equipped with overload and/or short circuit protection appliances; - Starters equipped with separate short circuit protection appliances and/or separate short circuit protection appliances with their own overload protection appliances--- After assembling a contactor or starter with a short-circuit protection device according to specified conditions, such as a comprehensive starter or protective starter, it is considered as an integral unit. In integrated starters and protective starters, circuit breakers or fuse combinations used as short-circuit protection devices should correspondingly meet the requirements of GB14048.2 and GB 14048.3 P>
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China