
This standard specifies the general requirements, visual inspection, instrument testing, electrical fire hazard judgment methods, and result processing for electrical fire detection of power transformation and distribution devices, low-voltage distribution lines, lighting devices, and general low-voltage electrical equipment, grounding and equipotential bonding. This standard is applicable to electrical fire detection for power users with a voltage of 10kV and below. This standard is not applicable to the electrical fire detection of underground mines, explosive hazardous areas, as well as anti-static, lightning protection, and firefighting facilities. The following normative references are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest version (including all modification orders) applies to this document. GB/T 14549 Quality of Electric Energy - Harmonics in Public Power Grids GB/T 18379-2001 Voltage Range of Electrical Installations in Buildings [IEC 60449] GB 4706.17 Safety of Household and Similar Electrical Appliances - Special Requirements for Electric Motors and Compressors [IEC 60335-2-34] GB 50303-2002 Code for Acceptance of Construction Quality of Building Electrical Engineering - Basic Requirements 3.1 Electrical installations and equipment must comply with the requirements of the current national technical standards and must have certificates of conformity and inspection (testing) certificates. 3.2 Products that implement production license or safety certification should also have a production license or safety certification mark. 3.3 Electrical fire detection should be carried out after electrical equipment and circuits have been running on load for more than 1 hour and have entered a normal thermal stable working state, with a temperature change rate of less than 1 ℃/h. 3.4 Electrical fire detection should not only comply with this standard, but also comply with the current national laws, regulations, and relevant standards P>
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China