Electronics
Complete set of power switches and control equipment testing
Complete set of power switches and control equipment testing
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Complete set of power switches and control equipment testing

This part of GB 7251 specifies the specific requirements for complete power switchgear and control equipment (PSC complete equipment) as follows: (1) complete equipment with a rated voltage of AC not exceeding 1000 V or DC not exceeding 1500 V; Fixed or mobile complete equipment with or without casing; A complete set of equipment intended for use in conjunction with equipment for power generation, transmission, distribution, and energy conversion, as well as equipment for controlling energy consumption; A complete set of equipment designed for special usage conditions, such as those used in ships and locomotives, as long as they meet the relevant specific requirements: a complete set of equipment designed for the electrical equipment of the machine, the IEC60204 series of standards includes supplementary requirements for the complete set of equipment that forms a part of the machine. This section applies to complete sets of equipment that are designed, manufactured, and validated in a one-time manner, or fully standardized for mass production. Production and/or assembly may not be carried out by the initial manufacturer (see 3.10.1). This section does not apply to individual devices and packaged components that comply with their respective product standards, such as motor starters, knife fuse switches, electronic equipment, etc. This section is not applicable to specific types of complete equipment in other parts of GB 7251. The complete equipment applied in this section will not be covered by other standards. Note 1: Throughout this section, the abbreviation PSC complete equipment (see 3.1.101) refers to complete power switchgear and control equipment. Note 2; IEC 60092 302 includes supplementary requirements for marine complete equipment. The following normative references are essential for the application of this document. For reference documents with dates suspended, only the dated version applies to this document. For reference documents without dates, the latest version (including all modification orders) applies to this document. Except for the following, Chapter 2 of GB 7251.1-2013 applies. Add: GB 14048.3-2008 Low voltage switchgear and control equipment - Part 3: Switches, isolators, isolating switches, and fuse combinations (IEC 60947-3:2005, IDT) GB 7251 1-2013 Low voltage switchgear and control equipment - Part 1: General (GB 7251 1-2013, IEC 61439-1:2011, IDT) IEC61140 Protection against electric shock - Common as parts for installation and equipment

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China