
In addition to the following clauses, this chapter of GB/T 19212.1-2016 applies to changes in input voltage settings: the following clauses are added to this chapter: based on the type of transformer supplying the corresponding output circuit, if the output voltage does not exceed the rated output voltage and the no-load output voltage does not exceed the output voltage deviation limit, a wider power supply voltage range (such as AC 100 V to AC 240 V) is allowed. This chapter of GB/T 19212.1-2016 applies to the output voltage and output current of the load. In addition to the following provisions, this chapter of GB/T 19212.1-2016 applies to the no-load output voltage: the following content is added to this chapter: at ambient temperature, when SMPS is connected to the rated power supply voltage at the rated power frequency, the no-load output voltage is measured. The no-load output voltage should not exceed: for SMPS with built-in separation transformers or autotransformers, it should be AC 1000 V or ripple free DC 1415 V-- For SMPS with built-in isolation transformers, it is AC 500 V or ripple free DC 708 V; For SMPS with built-in safety isolation transformers, it is AC 50V or ripple free DC 120V. For independent transformers, this output voltage limit also applies to the case of star series connection of output windings that are not predetermined to be interconnected. The difference between the no-load output voltage and the load output voltage should not be too large P>
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China