
Class C Masking - Low temperature testing should be conducted on Class C Masking. After placing the test object in air at a temperature of (-40 ± 3) ℃ for 4 hours, perform the simulated assembly test in 7.3.6 on the test object. 8.5W type shielding cover - High temperature test should be conducted on the W type shielding cover. Place the test object in air at a temperature of (70 ± 3) ℃ and a relative humidity of 93% for 4 hours, and perform the simulated assembly test in 7.3.6 on the test object. Type Z Masks - Ozone Resistance Test - Type Z Masks should undergo an ozone resistance test. This test is not required for level 0 masks. The ozone resistance test can be conducted using one of the following two methods. If there is a dispute, use Method A for testing. 8.6.1 Method A: Cut 12mm from the Z-type shielding cover × A 100mm sample is stretched for 20% and placed in a constant temperature oven at (40 ± 2) ℃ for (8 ± 0.5) h. The ozone concentration in the oven is (1 ± 0.01) mg/m at standard atmospheric pressure (101.3kPa). After removal, there should be no cracks on the test sample for visual inspection. The size of the metal round rod used in Method B test should comply with the provisions in Table 4. Bend the metal rod at 90 ° with a radius of curvature of 78mm. After the shielding cover is arranged on the metal rod, wrap the metal outer electrode around the raised part of the shielding cover. Refer to 7.4.3.1, ground the inner electrode, and apply a 15kV voltage to the outer electrode for 1 hour. After pressurization, perform a visual inspection. If there are no obvious cracks on the test sample, the test is passed
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China