Electronics
Wire to wire, wire to equipment, and instrument connection detection
Wire to wire, wire to equipment, and instrument connection detection
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Wire to wire, wire to equipment, and instrument connection detection

1 Scope: This standard specifies the general requirements, visual inspection, instrument testing, electrical fire hazard judgment methods and result processing for transformer and distribution equipment, low-voltage distribution lines, lighting devices, and general low-voltage electrical equipment, grounding and equipotential bonding electrical fire detection. This standard is applicable to electrical fire detection for power users with a voltage of 10kV and below. This standard is not applicable to the electrical fire detection of underground mines, explosive hazardous areas, as well as anti-static, lightning protection, and firefighting facilities. The following normative references are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest version (including all modification orders) applies to this document. GB/T 14549 Quality of Electric Energy - Harmonics in Public Power Grids GB/T 18379-2001 Voltage Range of Electrical Installations in Buildings [IEC60449] GB 4706.17 Safety of Household and Similar Electrical Appliances - Special Requirements for Electric Motors and Compressors [IEC 60335-2-34] GB 50303-2002 Code for Acceptance of Construction Quality of Building Electrical Engineering - Basic Requirements 3.1 Electrical installations and equipment must comply with the requirements of current national technical standards and must have certificates of conformity and inspection (testing) certificates. 3.2 Products that implement production license or safety certification should also have a production license or safety certification mark. 3.3 Electrical fire detection should be carried out after electrical equipment and circuits have been running on load for more than 1 hour and have entered a normal thermal stable working state, with a temperature change rate of less than 1 ℃/h. 3.4 Electrical fire detection should not only comply with this standard, but also comply with the current national laws, regulations, and relevant standards. 4. Transformer and distribution equipment 4.1. Oil immersed transformer 4.1.1. General requirements 4.1.1.1. Indoor installation of oil immersed transformers should comply with the following fire prevention regulations: a) Fire blocking should be implemented at the partition walls, holes, and openings of cable structures where cables from the transformer room to other distribution devices run through; b) Transformer rooms, distribution equipment rooms, and high-voltage capacitor rooms should be equipped with facilities to prevent small animals such as birds, snakes, and rats from entering the room through lighting windows, ventilation windows, doors, cable trenches, etc. 4.1.1.2 Combustible materials and debris should not be stacked inside the transformer room

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China