Electronics
Detection of residual current operated circuit breakers (RCBOs) with overcurrent protection for hous
Detection of residual current operated circuit breakers (RCBOs) with overcurrent protection for hous
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Detection of residual current operated circuit breakers (RCBOs) with overcurrent protection for hous

Testing standards:

(; B/T 2423.4-2008 Electrical and Electronic Products Environmental Testing, Part 2: Test Methods, Test Db; Alternating Damp Heat (12 hours to 12 hours cycle) (1EC'60068-2-30; 2005.1DT) GB/T2424.2-2005 Environmental Testing and Damp Heat Testing Guidelines for Electrical and Electronic Products (IEC 60068-3-4; 2001,11DT) G; B/T 4207-2012 Method for Determining the Resistance and Comparative Traceability Index of Solid Insulation Materials (IEC60112; 2009,1DT) GB4208 Degrees of Protection Provided by Enclosures (IP Code) (GB4208--2008, EC 605292001.11DT) (; l4343.1 Requirements for Electromagnetic Compatibility of Household Appliances, Electric Power Tools, and Similar Appliances - Part I: Emission (GB4343.1-2009. (CISPR 14-1: 2005.1DT) 6; L/T 5169.10 Fire Hazard Testing for Electrical and Electronic Products: Part 10: Glow Wire/Hot Wire Basic Test Methods, Glow Wire Devices and General Test Methods (GB/T5169.10-2006.1EC60695-2-10:2000.1DT) GB/T5169.11-2006 Fire Hazard Testing for Electrical and Electronic Products - Part 11: Glow Wire/Hot Wire Basic Test Methods - Glow Wire Flammability Test Method for Finished Products (1EC'60695-2-11:2000.1DT) G; B/T 5465.2-2008 Graphical Symbols for Electrical Equipment Part 2: Graphical Symbols (1EC 60417 DB; 2007.11DT) G; GB 10963.1-2005 Electrical Accessories, 'Circuit Breakers for Overcurrent Protection in Household and Similar Places - Part I: Circuit Breakers for AC Applications (IEC60898-1; 2002.11T) Gl316895 (All Parts) Electrical Installations in Buildings [IEC60364 (All Parts)] GB/T16895.10-2010 Low Voltage Electrical Installations - Part 4-44: Safety Protection, Voltage Disturbance, and Electromagnetic Disturbance Protection (1EC6034-4; 2007.1DT) GB/T16927.1 High Voltage Testing Techniques Part I: General Definitions and Test Requirements (GB/T 16927.1-2011, lEC "60060-1; 2006. MOD) (B/T 16927.2 High Voltage Testing Techniques Part 2: Measurement Systems (GB/T 16927.2-2013.1 EC '60060-22010. MD) (B/T 16935.1-2008 Insulation Coordination of Equipment in Low Voltage Systems Part I: Principles, Requirements, and Tests (1EC60664-1:2007.1DT) GB/T 16935,3, Insulation Coordination for Equipment within Low Voltage Systems - Part 3: Anti fouling Protection by Coating, Tank Sealing, and Molding (G/T16935.3-2005.1EC "6O664-3:2003.1DT) (; lB18499-2008 Residual Current Operated Protectors (RCDs) for Household and Similar Purposes - Electromagnetic Compatibility (IEC 61543; 1995A1: 2004A2:2005.1DT)

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China