Electronics
Metro track inspection
Metro track inspection
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Metro track inspection

The term

2.0.1 Stray current refers to the current flowing in a non specified circuit. Leakage current flowing into the ground or buried metal objects due to intentional and unintentional grounding. 2.0.2 Stray current corrosion is caused by external current corrosion caused by currents flowing on non designated circuits. 2.0.3 Protective potential The potential required for effective protection of metals. 2.0.4 Polarized potential The potential at the electrode/electrolyte interface becomes polarized due to the deviation of the potential caused by the flow of current. 2.0.5 Cathodic protection is a method of controlling electrochemical corrosion through cathodic polarization, including sacrificial anode method and impressed current method. 2.0.6 Transition resistance The resistance per unit length between the running rail and the structure, between the running rail and the earth, or between two other conductors. 2.0.7 Stray current drainage devices are devices that achieve electrical corrosion protection through electrical drainage. 2.0.8 Return cable of return line; The track negative cable connects the wires of the return rail and the substation, or is laid in parallel with the steel rail to serve as the return wire

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China