
This standard specifies the principles, conditions, contents, methods, plans, and report requirements for the phase leading test of synchronous generators for grid connected operation. This standard is applicable to synchronous generator units operating in parallel with the grid. The phase advance tests of synchronous condensers and pumped storage motors can be carried out in accordance with this standard. The following normative references are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest version (including all modified versions) applies to this document. GB 755 Rating and Performance of Rotating Electrical Machines GB/T 7064 Technical Requirements for Hidden Pole Synchronous Generators GB/T 7409.3 Excitation Systems for Synchronous Machines Technical Requirements for Excitation Systems of Medium Synchronous Generators GB/T 7894 Basic Technical Conditions for Hydraulic Generators GB/T 22264.1 Mounted Digital Display Electrical Measuring Instruments Part 1: Definitions and General Requirements GB/T 22264.2 Mounted Digital Display Electrical Measuring Instruments Part 2: Special Requirements for Ammeters and Voltmeters GB/T 22264.3 Mounted Digital Display Electrical Measuring Instruments Part 3: Special Requirements for Power Meters and Reactive Power Meters GB/T 22264.5 Mounted Digital Display Electrical measuring instruments - Part 5: Special requirements for phase meters and power factor meters (GB/T 22264.7) - Installed digital display electrical measuring instruments - Part 7: Special requirements for multifunctional instruments (GB/T 28566) - Safety conditions and evaluation for grid connection of generator sets (DL/T 583) - Technical conditions for static rectification excitation systems and devices of large and medium-sized hydroelectric generators (DL/T 755) - Guidelines for safety and stability of power systems (DLT 843) - Technical conditions for excitation systems of large steam turbines (DL/T 970) Guidelines for Abnormal and Special Operation and Maintenance of Electric Motors DL/T 1040 Grid Operation Guidelines DL/T 1164 Turbine Generator Operation Guidelines DL/T 1166 Large Generator Excitation System Field Test Guidelines DLT 5153 Technical Regulations for Design of Auxiliary Power in Thermal Power Plants NB/T 35044 Hydraulic Power Plant Auxiliary Power Design Regulations
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China