
This part of GB/T 18494 specifies the technical requirements, design, and testing of power transformers and reactors assembled in semiconductor converter equipment. This part is not applicable to conventional AC distribution transformers p> This section is applicable to power converters of any capacity. Typical applications include: electrolytic thyristor rectifiers, electrolytic diode rectifiers, high-power drive thyristor rectifiers, waste furnace thyristor rectifiers, and variable speed drive inverter diode rectifiers. This section also applies to the voltage regulating unit of step-down regulators or autotransformers. The maximum voltage of the equipment on the valve side winding shall not exceed 40.5kV p> This section is not applicable to transformers for high-voltage direct current transmission p> Although the complete set of converter equipment standards (such as GB/T
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China