
BAIJIAN - a professional third-party testing and inspection platform that provides relevant testing and inspection services such as safety tool testing. It provides authoritative CMA/CNAS testing reports with short testing cycles, low costs, and thoughtful services, making testing more than BAIJIAN p> Testing cycle: Generally 3-7 working days, expedited. Inspection scope: insulated gloves, insulated shoes, insulated operating rods, insulated pliers, grounding wires, insulated rubber pads, fall arresters, safety ropes, safety helmets, safety belts, dense mesh safety nets, foot buckle detection, climbing tools, switch operating handles, indoor temperature and humidity meters, fuse replacement handles, safety signs, grounding wire groups, insulated operating rods, safety signs, pressure gauges, insulated rods, insulated non-sparking copper axes, single hook climbing ladders, Lingke Stick, Centipede Hanging Ladder, Insulated Combination Tool, Insulated Bench, Wire Pliers, Insulated Scissors, Speed Difference Control Device, Self Locking Device (including Guide Rail Type and Rope Type), Buffer, Conductive Shoes, Personal Security Wire, Portable Short Circuit Grounding Wire, Capacitive Tester, Phase Detector, Insulating Cover, Insulating Partition, Insulating Rope, Insulating Clamp, and other electrical safety tools. Testing cost: Specific depends on the number of samples and project standards. Please consult online customer service for details. The testing items include performance analysis, quality testing, insulation performance testing, routine testing, monthly/quarterly/annual inspection, etc.
Normative reference documents
The following documents are essential for the compliance of this standard.
. For dated references, only the dated version applies to this document. For undated references, the latest version (including all amendments) applies to this document p>GB/T 2812 Test Methods for Safety Helmets
GB 12011 Foot Protection Electrical Insulated Shoes
GB/T 16927.1 High Voltage Test Techniques Part 1: General Definitions and Test Requirements
GB/T 17889.2 Fuzi Part 2: Requirements, Tests and Markings
GB 21146 Personal Protective Equipment Occupational Shoes
GB 26861 Electric Power Safety Work Regulations High Voltage Laboratory Part
DL/T 740 Capacitive Tester
DL/T976 Live Working Tools
Preventive testing procedures for devices and equipmentFunction of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China