Scope
This section specifies the basic safety work requirements for personnel engaged in thermal and mechanical operations in power production on the production site or at work. This section applies to all personnel engaged in power production and relevant personnel entering the power production site p> The following documents are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest version (including all modification orders) applies to this document p>
GB/T 3608 Classification of High Altitude Operations
GB/T 3787 Management, Use, and Safety Technical Regulations for Inspection and Maintenance
GB 4387 Safety Regulations for Railway and Road Transportation in Industrial Enterprises
GB/T 6067 Safety Regulations for Lifting Machinery
GB 6095 Safety Belts
GB 12348 Emission Standard for Industrial Enterprise Boundary Environmental Noise
GB/T 19155- Hanging Baskets for High Altitude Operations
GB 50016 Code for Fire Protection Design of Buildings
GB 50229 Fire Protection Code for Design of Thermal Power Plants and Substations p>
DL 408 Electrical Safety Work Regulations (Electrical Part of Power Plants and Substations)
DL409 Electrical Safety Work Regulations (Power Line Part)
DL 612 Supervision Regulations for Boiler and Pressure Vessels in the Power Industry
DL/T 651 Technical Requirements for Hydrogen Humidity of Hydrogen Cooled Generators
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China