Electronics
Inspection of overhead distribution line fittings, bare wire fittings, and insulated wire fittings
Inspection of overhead distribution line fittings, bare wire fittings, and insulated wire fittings
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Inspection of overhead distribution line fittings, bare wire fittings, and insulated wire fittings

Where is the testing of power fittings done? What does it take to do a power fitting inspection report? Baijian Electric Power Testing can provide you with a one-stop service for power hardware testing and certification, with fast and authoritative reports. So, what are the standards and requirements for testing power fittings

The following are the standards and requirements for the inspection of power fittings

GB/T 699-1999 High Quality Carbon Structural Steels

GB/T 700-2006 Carbon Structural Steels

GB/T 1173-1995 Cast Aluminum Alloys

GB/T 1179-2008 Round Wire Concentric Stranded Hollow Conductors

GB/T 2314-2008 General Technical Conditions for Power Hardware

GB/T 2315-2008 Nominal Failure Load Series and Connection Dimensions for Power Hardware

GB/T 2317.1-2008 Test Methods for Power Hardware Part 1 Part: Mechanical Testing

GB/T 2317.2-2008 Test Methods for Electric Power Hardware Part 2: Corona and Radio Interference Testing

GB/T 2317.3-2008 Test Methods for Electric Power Hardware Part 3: Thermal Cycle Test Methods

GB/T 2317.4-2008 Test Methods for Electric Power Hardware Part 4: Acceptance Rules

GB/T 3880.2-2006 Aluminum and Aluminum Alloy Plates for General Industrial Use Strip Part 2: Mechanical Properties

GB/T 4437.1-2000 Aluminum and Aluminum Alloy Hot Extruded Tubes Part 1: Seamless Round Tubes

GB/T 5075-2001 Terminology of Electric Power Fittings

GB/T 9440-2010 Shortable Iron Castings

GB/T 14049-2008 Rated Voltage 10kV Overhead Insulated Cables

GB/T 14315-2008 Compression Copper for Power Cable Conductors Aluminum terminal blocks and connecting pipes

GB/T 16927.1-2011 High voltage testing techniques Part 1: General definitions and testing requirements

GB 50054-2011 Low voltage distribution design code

GB 50061-2010 Design code for 66kV and below overhead power lines

DL/T 5220-2005 Technical code for design of 10kV and below overhead power distribution lines

DL/T 683-2010 Power fittings product model naming method

DL/T 756-2009 Suspension Clamps

DL/T 757-2009 Strain Clamps

DL/T 758-2009 Connection Hardware

DL/T 759-2009 Connection Hardware

DL/T 763-2001 Technical Conditions for Pre twisted Hardware for Overhead Lines

DL/T 764.1-2001 Special Fasteners for Power Hardware Hexagonal Head Pinhole Bolts

DL/T 764.2-2001 Special Fasteners for Power Hardware Closed Pin

DL/T 76 5.1-2001 Technical Conditions for Hardware of Overhead Distribution Lines

DL/T 765.2-2004 Hardware of Overhead Bare Conductors with Rated Voltages of 10kV and Below

DL/T 765.3-2004 Hardware of Overhead Insulated Conductors with Rated Voltages of 10kV and Below

DL/T 768.1-2002 Manufacturing Quality of Power Hardware - Separable Iron Castings

DL/T 768.2-2002 Manufacturing Quality of Power Hardware - Forged Parts

DL/T 768.3-2002 Manufacturing Quality Impact of Power Hardware Pressure parts

DL/T 768.4-2002 Manufacturing quality of power fittings, ductile iron parts

DL/T 768.5-2002 Manufacturing quality of power fittings, aluminum parts

DL/T 768.6-2002 Manufacturing quality of power fittings, welded parts

DL/T 768.7-2012 Manufacturing quality of power fittings, hot-dip galvanized layer of steel parts

YB/T 124-1997 aluminum clad steel strand

YB/T 4165-2007 steel strand for shock hammer

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China