Electronics
Service Robot (EMI) Detection
Service Robot (EMI) Detection
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Service Robot (EMI) Detection

Service robot type test third-party testing agency CNAS testing report, where can the service robot type test be conducted, what tests need to be conducted for the service robot, how to choose the testing level for the service robot, and who can issue the CNAS testing report for the service robot 1. Functional test: including button, display, interlocking, action of each axis, command action, etc 2. Safety test: grounding resistance and protective grounding, insulation resistance, dielectric strength, etc 3. Environmental condition test: temperature upper limit test, temperature lower limit test, constant damp heat test, vibration test 4. Power source test: power, pressure fluctuation, temperature rise, etc

5. Transportation performance: 200km on third-class highway 6. Reliability: The reliability verification test method is specified by the product standard

For third-party testing institutions, only safety tests and environmental condition tests can be conducted. Other projects can only be completed by the manufacturer themselves, and the laboratory cannot implement them without corresponding equipment.

1. Protective grounding test: carried out in accordance with the requirements of GB/T5226.1 2. Insulation resistance test: carried out in accordance with the requirements of GB/T5226.1 3. Dielectric strength test: carried out in accordance with the requirements of GB/T5226.1 4. Lower limit test of working temperature: Reduce the temperature to 0 ℃, maintain it for at least 30 minutes, and then power on for 4 hours to ensure normal operation 5. Storage temperature lower limit test: Reduce the temperature to -40 ℃, hold for at least 4 hours, and store for 4 hours before normal operation 6. Working temperature upper limit test: Raise the temperature to 40 ℃, maintain it for at least 30 minutes, and then power on for 4 hours to ensure normal operation 7. Storage temperature upper limit test: Raise the temperature to 55 ℃, store for 4 hours, and after 4 hours, reduce to normal atmospheric conditions, and recover for 4 hours under these conditions. Check the requirements of the appearance radiation product standard, and then turn on the power to operate. It should be able to work normally 8. Constant damp heat test under working conditions: Adjust the temperature to 40 ℃, maintain it for at least 30 minutes, and achieve a humidity of 80% within 1 hour. The test time is 48 hours. During this period, it should be able to operate normally when powered on 9. Constant humidity and heat test under storage conditions: Adjust the temperature to 40 ℃, humidity to 93%, store for 24 hours, recover under atmospheric conditions for 12 hours, inspect the appearance to meet the requirements of the product standard, and then power on and run it to ensure normal operation 10. Vibration test: initial and post response inspection, fixed frequency durability test, sweep frequency durability test, and post vibration response inspection

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China