
Usually, open excavation construction, maintenance, and restoration are adopted, resulting in high engineering costs and significant environmental impacts; Introducing advanced CCTV (Closed Circuit Television) pipeline endoscope detection technology can provide a more intuitive understanding of the internal status of underground drainage pipelines, avoid risks of personnel working underground, and reduce the impact on road traffic p>
Construction steps and precautions of pipeline closed circuit television detection method (CCTV detection system)
The basic steps of CCTV detection are as follows:
① We arrive at the site, collect data, and conduct on-site investigation p> ② Use the CCTV detection system to detect and collect image data, and then specify corresponding detection and repair plans p> ③ Based on the inspection results, summarize the data, issue a testing report, submit an evaluation report, and carry out pipeline repair construction p>
Precautions are as follows:
A. Data to be collected before pipeline inspection: ① pipeline plan, ② pipeline completion drawing, etc., ③ other inspection data of the pipeline.
p> B. Data to be collected for on-site investigation: ① terrain, traffic, and pipeline conditions around the pipeline; ② visual inspection of water level, mud depth, and water flow when opening the pipeline;③ verification of pipeline location, diameter, and pipe materials in the pipeline data p> C. Technical precautions before pipeline completion acceptance: ① The pipeline should be tested for tightness and test records of closed air or water should be presented. ② Before testing, it should be ensured that the accumulated water in the pipeline does not exceed 5% of the pipe diameter. ③ Before testing begins, dredging, cleaning, ventilation, and toxic and harmful gas testing must be carried out p> D. Precautions before pipeline repair and testing: ① The pipeline that needs to be tested should be flushed. ② Before testing, it should be ensured that the accumulated water in the pipeline cannot exceed 15% of the pipe diameter. ③
Before testing, for safety reasons, it is necessary to conduct experiments on dredging, cleaning, ventilation, and toxic and harmful gases P>
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China