Electronics
Range hood detection
Range hood detection
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Range hood detection

This specification is applicable to range hood products; Including electric range hoods installed on top of household distillation stoves, stoves, or similar appliances

Range hood testing items:

Testing items and technical requirements

Serial number

Testing items

According to laws, regulations or standards

Compulsory/recommended

1

Mark and instructions

GB 4706.28-2008 GB4706.1-2005

Compulsory

2

Protection against touching live parts

GB 4706.28-2008 GB4706.1-2005

Mandatory

3

Input power and current

GB 4706.2 8-2008 GB4706.1-2005

Compulsory

4

Heating

GB 4706.28-2008 GB4706.1-2005

Compulsory

5

Leakage current and electrical strength at working temperature

GB 4706.28-2008 GB4706.1-2005

Compulsory

6

Patience

GB 4706.28-2008 GB4706.1-2005

Compulsory

7

Leakage current and electrical strength

GB 4706.28-2008 GB4706.1-2005

Mandatory

8

Overload protection for transformers and related circuits

GB 4706.28-2008 GB4706.1-2005

Mandatory

9

Abnormal operation

GB 4706.28-2008 GB4706.1-2005

Mandatory

10

Stability and mechanical hazards

GB 4706.28-2008 GB4706.1-2005

Mandatory

11

Mechanical strength

GB 4706.28-2008 GB4706.1-2005

Mandatory

12

Structure

GB 4706.28-2008 GB470 6.1-2005

Mandatory

13

Internal Wiring

GB 4706.28-2008 GB4706.1-2005

Mandatory

14

Power Connection and External Flexible Cords

GB 4706.28-2008 GB4706.1-2005

Mandatory

15

External Wiring Terminals

GB 4706.28-2008 GB4706.1-2005

Mandatory

Grounding Measures

GB 4706.28-2008 GB4706.1-2005

Mandatory

17

Screws and Connection

GB 4706.28-2008 GB4706.1-2005

Mandatory

18 years old

Electrical clearances, Creepage distance and solid insulation

GB 4706.28-2008 GB4706.1-2005

Mandatory

19

Resistance to fire

GB 4706.28-2008 GB4706.1-2005

Mandatory

20

Air performance (air volume)

GB/T 17713-2011

Recommended

21

Air performance (air pressure)

GB/T 17713-2011

Recommended

22

Noise

GB/T 17713-2011

GB 19606-2004

Mandatory

23

Total pressure efficiency,

,

GB 29539-2013

Mandatory

24

Standby power

GB 29539-2013

Mandatory

25

Shutdown power

GB 29539-2013

Mandatory

26

Normal odor reduction

GB 29539-2013

Mandatory

27

Energy efficiency level

GB 29539-2013

9-2013

Mandatory

Note: The sampling inspection of range hoods includes but is not limited to the above testing items, Specific sampling shall prevail

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China