Electronics
Microcomputer line protection test detection
Microcomputer line protection test detection
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Microcomputer line protection test detection

There are three main testing instruments for microcomputer protection devices: microcomputer relay protection tester, three-phase current generator, and multimeter

1) It is recommended to use a microcomputer relay protection tester that can simultaneously output three-phase voltage and three-phase current and has input timing for testing high-voltage microcomputer protection devices 2) Test the low-voltage microcomputer protection device. If the current sampling value is output to the microcomputer protection device through the current transformer, a microcomputer relay protection tester can be selected; If the current sampling value is directly output to the microcomputer protection device through a dedicated transformer, only a three-phase current generator can be used to apply the test current on the primary side

2. Test precautions

1) The testing instruments and cabinets should be reliably grounded to ensure that the microcomputer protection device and testing instruments are grounded together.

During the power-on or testing process of the microcomputer protection device, it is strictly prohibited to plug or unplug the device's plug-in, and it is strictly prohibited to touch the plug-in circuit. When it is necessary to plug and unplug, the power supply must be turned off first, and the external test power supply must be disconnected. Release static electricity on your hands or wear a static protective belt before proceeding with the operation During the test process, it is strictly prohibited to apply high voltage incorrectly to the low voltage or communication terminals when replacing the test line The selection of test points must be accurate. The voltage and current lines of the tester should not be directly added to the terminals of the microcomputer protection device, but should be added to the root of the transformer in order to find the degree of signal attenuation during the collection process and ensure the integrity of the test

3. Preparation before the test

1) Before the test, carefully read the manual or debugging outline of the microcomputer protection device, and verify whether the manual, nameplate of the microcomputer protection device, actual drawings, and the voltage and current transformation ratio of the system are consistent.

2) Read the manual of the microcomputer protection tester in detail, and be sure to proficiently master the operating program before the test. Avoid erroneous operations that impose unbearable voltage and current on the microcomputer protection device, causing equipment damage Tighten the screws or quick connectors of the microcomputer protection device to ensure a secure connection

4) Enter the protection menu and set the protection settings. When inputting the fixed value, it is necessary to understand the connotation of the fixed value sheet, and at the same time, organize and label the fixed value sheet for use in reviewing the fixed value

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China