Electronics
Dry type voltage transformer detection
Dry type voltage transformer detection
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Dry type voltage transformer detection

&Nbsp&Nbsp&Nbsp&Nbsp; The basic structure of voltage transformers is very similar to that of transformers. It also has two windings, one called the primary winding and the other called the secondary winding. Both windings are installed or wound on the iron core. Provide insulation between two windings and between the winding and the iron core, thereby electrically insulating the two windings and between the winding and the iron core. When the voltage transformer is operating, the primary winding N1 is connected in parallel with the line, and the secondary winding N2 is connected in parallel with the instrument or relay. Therefore, when measuring voltage on high-voltage lines, although the primary voltage is high, the secondary voltage is low, which can ensure the safety of operators and instruments

 &Nbsp&Nbsp; Before putting the voltage transformer into operation, it should be tested and inspected according to the specified items in the regulations. For example, polarity measurement, connection group, vibration insulation, nuclear phase sequence, etc 2. The wiring of the voltage transformer should ensure its correctness. The primary winding should be connected in parallel with the tested circuit, and the secondary winding should be connected in parallel with the voltage coil of the connected measuring instrument, relay protection device, or automatic device. At the same time, attention should be paid to the correctness of polarity 3. The load capacity connected to the secondary side of the voltage transformer should be appropriate, and the load connected to the secondary side of the voltage transformer should not exceed its rated capacity, otherwise it will increase the error of the transformer and make it difficult to achieve measurement accuracy

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China