Electronics
Bushing (110kV and below)/electrical equipment testing
Bushing (110kV and below)/electrical equipment testing
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Bushing (110kV and below)/electrical equipment testing

Electrical Testing Catalogue:

1. Electrical Testing Distribution Equipment

2. Electrical Testing Line Laying

3. Electrical Testing Lighting, Switch and Socket Installation

4. Other Regulations for Electrical Testing

5. Electrical Testing Conditions, Meaning and Content

1. Electrical Testing Distribution Equipment

1. Visual Inspection of the Installation Position, Fire Protection Level, and Hole Blockage in the Transformer Room; Transformer settings, appearance quality, component integrity, and fire prevention measures; Laying of high and low voltage cables (wires) 2. Electrical testing uses infrared series instruments to detect the temperature of each contact of the transformer winding and high and low cables (lines), and uses a temperature spectrum 3. Visual inspection of high (low) voltage distributor settings, installation quality, cabinet wiring, high (low) pressure cable (line) joints, grounding, complete accessories, and fire prevention measures 4. Use traditional instruments to measure (or read) the voltage (flow) value of each phase line Unbalanced current value of N line, abnormal current and grounding resistance value of PE line 5. Use an infrared series instrument to measure the temperature of the wire and its connection points, switch contacts, and take a temperature spectrum

Secondly, the laying of electrical detection lines.

Electrical detection checks for hidden applications, bright lights, and electrical fire hazards at different power supply positions, which exist in the installation and use of lines directly applied and wearing protective tubes.

III. Lighting of electrical detection, installation of switches and sockets

Check for electrical fire hazards in the installation and use of various lighting equipment.

Fourth,  Other regulations for electrical testing

Check the installation of switches in different electrical positions.

There is a risk of electrical fire in the socket

Fifth, Electrical Testing Conditions, Meaning and Content

1. Testing and measurement should be carried out under thermal stability conditions when the electrical equipment and line load exceeds 1n 2. It should be conducted on-site with the relevant technical personnel of the inspected party

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China