Electronics
Information system room power and environmental system testing
Information system room power and environmental system testing
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Information system room power and environmental system testing

1、 System Overview and Description: In order to improve the security management level of power environment equipment, network equipment, and other equipment in the information center computer room, enhance the stability of equipment operation, timely detect equipment faults and hidden dangers, improve management efficiency, and reduce work pressure, a centralized monitoring system for the computer room is specially established. The system construction requires a status demonstration of the overall power environment equipment in the computer room, rapid fault location, timely fault notification, storage of alarm information and system operation data, drawing of analysis charts, and equipment inspection and analysis records. The system construction requires the integration and centralized monitoring of power equipment such as computer room distribution, UPS, batteries, environmental equipment such as air conditioning, temperature and humidity, water leakage detection, access control, video and other security equipment, fire protection equipment, as well as network equipment such as routers, switches, servers, etc., and the interconnection of monitoring systems of each district bureau with the municipal bureau monitoring center, so that the municipal bureau can timely understand the operation status of the district bureau information system, And obtain direct data on device availability and other data Secondly, the centralized monitoring system requires power, environment, network, and security. The centralized monitoring system aims to improve the management level of the computer room, ensure stable operation of the system, and provide accurate, reliable, and timely notification of equipment failure alarms. It records the monitored data and achieves the requirements of future analysis. 2.1 Monitoring Content 2.1.1 Distribution System Monitoring (1) The system should be able to monitor the status of the power distribution in the machine room. For example, three-phase phase voltage, phase current, line voltage, line current, active power, reactive power, apparent power, frequency, power factor, electrical degree, etc; (2) The system can achieve alarms for high or low voltage, high current, unstable frequency, phase loss, and high air switch temperature; (3) The system supports management personnel to query the power distribution operation status of the computer room in real-time through SMS; (4) The system can generate alarm reports for the power distribution system in the computer room, and can search or print them as needed; (5) The system records the historical curve of the power distribution parameters in the computer room, and can view the curve record of any day at any time; (6) Provide the function of importing historical data into Excel tables for various analysis and comparison in Excel; (7) Real time status data of power distribution in the computer room, as well as alarm events, can be viewed through the IE browser. Author: Weak Current Intelligence - Budget Cost https://www.bilibili.com/read/cv8592339/ Source: Bilibili

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China