Electronics
Testing methods for Ethernet switches
Testing methods for Ethernet switches
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Testing methods for Ethernet switches
Standard and Method for Functional Testing of Industrial Ethernet Switches< p>

First, data frame filtering:

Test the data frame filtering function of the tested device.

a) Testing steps:

1) Build a testing environment according to Figure 1 2) Network tester test port 1 sends data frames at line speed to test ports 2 and 3

3) Record the data reception status of test port 2 and test port 3 of the network tester 4) Configure address filtering for port 2 on the tested device to filter the source MAC address of the data stream 5) Network tester test port 1 sends data frames at line speed to test ports 2 and 3

6) Record the data reception status of test port 2 and test port 3 of the network tester

b) Expected results:

1) In step 3), both test ports 2 and 3 of the network tester received data without losing data frames In step 6 of step 2, the network tester test port 2 cannot receive data, and test port 3 receives data without losing data frames

Figure 1 Data Frame Filtering Test Chart

Second, Ring Network Recovery:

Ring network recovery is to divide multiple paths between two points into communication paths and backup paths in the ring network. Data forwarding is carried out on the communication path, while the backup path is only used for chain listening. Once the communication path is found to be invalid, communication is automatically switched to the backup path

a) Testing steps:

1) Build a testing environment according to Figure 2 2) Select a network tester with a test frame length of 64 bytes and a test time of 30 seconds During the entire experimental process, a proportional data stream (GOOSE message with priority 4 for Stream 1 and TCP data stream with priority 1 for Stream 2) is sent at Test Port 1 and Test Port 2. A broadcast frame of 1Mbits/s is sent at Test Port 3 and Test Port 4, and a GOOSE/ms data stream is sent at Test Port 5 and Test Port 6. Each experiment changes the load of test port 1 and test port 2 to 10% and 95%, respectively 4) Insert and unplug three paths A, B, and C respectively, and test the recovery time of the ring network

5) Calculation method for ring network recovery time: Ring network recovery time (ms)= × Test time (ms)

b) Expected result: The recovery time of the ring network should not exceed 50ms through each switch

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China