
1. The characteristics match well with the characteristics of the protected insulation
2. Ensure that its residual voltage is lower than the impact electrical strength of the protected insulation
3. The protected equipment must be within the protection range of the lightning arrester
Parameters of the lightning arrester:1. Continuous operating voltage: voltage that allows long-term operation p> 2. Rated voltage (kV): The maximum power frequency voltage allowed for short time. The lightning arrester can discharge and extinguish the arc at this power frequency voltage, but it cannot operate for a long time at this voltage p> 3. Power frequency withstand voltage second characteristic: indicates the ability of zinc oxide lightning arrester to withstand overvoltage under specified conditions p> 4. Nominal discharge current (kA): The peak discharge current of the lightning arrester level p> The classification and structure of lightning arresters are commonly used, including valve type lightning arresters, tube type lightning arresters, protective gap lightning arresters, and metal oxide lightning arresters P>
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China