Electronics
YCT series electromagnetic speed regulation motor detection
YCT series electromagnetic speed regulation motor detection
Click here for online message:
Drop us a line
Service@Baijiantest.Com
YCT series electromagnetic speed regulation motor detection

What unit can conduct speed control motor testing? Baijian Testing Center is a comprehensive scientific research institution with CMA certification. It can provide users with scientific and rigorous testing services including minimum speed, nominal capacity, rated input voltage level, and input power. Usually, a speed control motor testing report can be issued within 7-15 working days Applicable samples: speed regulating motors, etc Test items: minimum speed, nominal capacity, rated input voltage level, input power supply, vibration test, pollutant detection, overload capacity test, continuous operation test, protection function test, etc Testing cycle: Generally, a testing report is issued within 7-15 working days Testing fee: Please consult an online engineer or directly call the consultation hotline

Relevant testing standards: JB/T 11820-2014 Technical conditions for internal feedback chopper AC speed regulation motor systems JB/T 6450-2010 Technical conditions for YCTD series electromagnetic speed regulation motors (frame numbers 100-315) JB/T 56016-1999 Quality Classification of Electromagnetic Speed Regulating Motors GB/T 16961-2009 General Technical Conditions for Electronic Speed Regulating Micro Asynchronous Motors GB/T 12669-2012 General Technical Conditions for Semiconductor Converter Cascade Speed Regulating Devices GB/T 13957-2008 Basic Series Technical Conditions for Large Three-phase Asynchronous Motors GB/T 14549-1993 Power Quality Public Power Grid Harmonics GB/T 16927.1-2011 High Voltage Testing Techniques Part 1: General Definitions and Test Requirements GB/T 20626.1-2006 Special Environments Conditions for high altitude electrical and electronic products - Part 1: General technical requirements GB/T 20635-2006 Special environmental conditions - Technical requirements for high voltage electrical appliances for high altitude use GB/T 22580-2008 Special environmental conditions - Technical requirements for high voltage electrical equipment for high altitude use - Low voltage switchgear and control equipment JB/T 7594-2006 YR series high voltage wound rotor three-phase asynchronous motors - Technical conditions (frame numbers 355-630)

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China