
The provisions contained in the following standards constitute the basic provisions of this bidding technical document by reference in this bidding technical document. At the time of publication of this bidding technical document, all versions shown are valid. All standards will be revised, and parties using this bidding technical document should explore the possibility of using the latest versions of the following standards. Arrange the standards in order of standard numbers, and if the requirements of each standard are different, meet the higher standard requirements. IEEE Std C37.111-1999 IEEE Standard Common Format for Transient Data Exchange (COMTRADE) For Power Systems GB/T 2423.1-2008 Environmental Testing of Electrical and Electronic Products Part 2: Test Methods Test A: Low Temperature GB/T 2423.2-2008 Environmental Testing of Electrical and Electronic Products Part 2: Test Methods Test B: High Temperature GB/T 7261-2008 Basic Test Methods for Relay Protection and Safety Automatic Devices GB/T 11287-2000 Electrical Relays Part 21: Vibration, Impact, Collision, and Seismic Testing of Measuring Relays and Protective Devices Part 1 Vibration test (sine wave) GB/T 14537-1993 Impact and Collision Tests for Measuring Relays and Protection Devices GB/T 14598.9-2010 Measuring Relays and Protection Devices Part 22-3: Electrical Disturbance Tests Radiated Electromagnetic Field Immunity GB/T 14598.10-2007 Electrical Relays Part 22-4: Electrical Disturbance Tests for Measuring Relays and Protection Devices Electrical Fast Transients/Burst Immunity Tests GB/T 14598.13-2008 Electrical Relays Part 22-1: Measuring Relays and Protection Devices Electrical disturbance test for protective devices -1 MHz pulse group immunity test GB/T 14598.14-2010 Measurement relays and protective devices - Part 22-2: Electrical disturbance test - Electrostatic discharge test GB/T 14598.16-2002 Electrical relays - Part 25: Electromagnetic emission test for measurement relays and protective devices GB/T 14598.17-2005 Electrical relays - Part 22-6: Electrical disturbance test for measurement relays and protective devices - Radio frequency field induction Immunity to Conducted Disturbances GB/T14598.18-2007 Electrical Relays - Part 22-5: Electrical Disturbance Testing for Measuring Relays and Protection Devices - Surge Immunity Testing GB/T14598.19-2007 Electrical Relays - Part 22-7: Electrical Disturbance Testing for Measuring Relays and Protection Devices - Power Frequency Immunity Testing GB/T 16720.1-2005 Industrial Automation Systems - Manufacturing Message Specifications - Part 1: Service Definitions GB/T 16720.2-2005 Industrial Automation Systems Unified Manufacturing Message Specification Part 2: Protocol Specification GB/T 7424.1-2003 Optical Cable Part 1: General DL/T 478-2001 General Technical Conditions for Static Relay Protection and Safety Automatic Devices DL/T 553-2005 Technical Guidelines for Fault Dynamic Recording of 220-500kV Power Systems DL/T 860.1-2004 Substation Communication Networks and Systems Part 1: Introduction DL/T 860.2-2006 Substation Communication Networks and Systems Part 2: Terminology Network Message Recording Analysis I Technical Proposal for Integrated Devices Page 3 of 22 DL/T 860.3-2004 Substation Communication Networks and Systems Part 3: General Requirements DL/T 860.4-2004 Substation Communication Networks and Systems Part 4: System and Project Management DL/T 860.5-2006 Substation Communication Networks and Systems Part 5: Functional Communication Requirements and Device Models DL/T 860.6-2008 Substation Communication Networks and Systems Part 6: Variations Related to Intelligent Electronic Equipment Communication Configuration Description Language for Power Stations DL/T 860.71-2006 Substation Communication Networks and Systems - Part 7-1: Basic Communication Structure - Principles and Models for Substation and Feeder Equipment DL/T 860.72-2004 Substation Communication Networks and Systems - Part 7-2: Basic Communication Structure for Substation and Feeder Equipment - Abstract Communication Service Interface (ACSI) DL/T 860.73-2004 Substation Communication Networks and Systems - Part 7-3: Basic Communication Structures for Substation and Feeder Equipment - Common Data Class DL/T 860.74-2006 (IEC61850-7-4:2003) Substation Communication Networks and Systems - Part 7-4: Basic Communication Structures for Substation and Feeder Equipment - Compatible Logic Node Class and Data Class DL/T 860.81-2006 Substation Communication Networks and Systems - Part 8-1: Specific Communication Service Mapping (SCSM) Mapping MMS (ISO/IEC 9506 Parts 1 and 2) and ISO/IEC 8802-3 DL/T 860.92-2006 Substation Communication Networks and Systems - Part 9-2: Specific Communication Service Mapping (SCSM) - Sampling Values for Mapping to ISO/IEC 8802-3 DL/T 860.10-2006 Substation Communication Networks and Systems - Part 10: Consistency Testing - Southern Power Grid Dispatching [2006] No. 13 Specification for Communication and Interface between Main Station and Sub Station of China Southern Power Grid Relay Protection Fault Information System (Revised in 2006): Radio and Television Regulatory Commission [2008] No.1 Guangdong Power System Relay Protection and Anti accident Measures 2007 Edition S.00.00.05/Q102-0028-1001-8103 Technical Specification for Digital Substation of Guangdong Power Grid Company S.00.005/Q106-0003-0808-2449 Technical Specification for GPS Time Synchronization System of Guangdong Power Grid Substation S.00.005/Q102-0007-0910-6489 Technical Specification for Fault Recording Device of Guangdong Power Grid Company Q/GD-1001-01-2005 Construction Specification for Power Communication Optical Cable Engineering
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China